Zephyr CSHE42SX Manual Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 23
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
www.zephyronline.com
10
Installation - Preparing External B lower
The external blower kit consists of an 8”
collar, and external blower wiring box. The
external blower is purchased separately.
ATTENTION
The following are intructions on preparing your hood for installation with external blower model CBE-1000.
For instructions on installing internal blower model CBI-600 please turn to page “8”.
NOTE: Please refer to the CBE-1000 manual for external blower mounting instructions.
1. Remove screws from internal ange.
2. Remove internal ange from hood. 3. Position 8” collar as shown.
4. Att ach 8” collar to hood as shown using
provided 1/2” self t apping screws.
5. Attach external blower wiring box to top of
hood using provided 1/2” self t apping
screws.
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 22 23

Comentarios a estos manuales

Sin comentarios