10. Ducting Version-horizontal discharge ONLY:
Connect ducting to transition for horizontal
discharge, seal with duct tape and fix transition to
the wall with four screws, use the included
adhesive rubber tape to seal with hood once
mounted.
stud
Cut out for
vent system
Vent system
Transition with
gravity damper
.....seal with
duct tape.....
...fix to drywall
with max 4 screws....
Upper fastener
location (Hooks)
Installation
11. Determine position of the conduit and cut a 1-1/4"
(3.2 cm) hole at this location. Position the conduit.
Run wires through hole according the National
Electrical Code or CSA Standards and local codes
and ordinances.
There must be enough power supply cable from the
fused disconnect (or circuit breaker) box to make
the connection in the hood’s Junction box/es.
Use caulking to seal all openings. Further
adjustment do conduit passage may be required
when performing electrical connection.
Do Not turn on power until installation is completed.
12.Remark center line and hood bottom on same
location as before and tape template on wall as in
step 4 above.
13.Mount 2 hooks with wood screws (supplied in
mounting hardware kit) on top locations marked on
template, then remove template.
14. If necessary, two plastic spacer can be fitted on
rear side of the hood on screws passages (lower
fastener locations - snap into place) and fit Rubber
adhesive tape as shown in figure below.
Note: before using, the Rubber adhesive tape
supplied must be cut in 3 equal lenght pieces.
Spacers