Zephyr CPA-E42ASX Guía de instalación Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 27
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
18
13. Optional duct cover installation:
a. Remove the support bracket from the Duct Cover
assembly and attach it to the ceiling with 2 drywall
anchors and screws
Note: The printed index on the bracket must match
the center line previously drawn (See installation
step 2).
Conduit
Duct
Position
reference
Position
reference
CenterLine
Duct cover
support barcket
Installation - Installing the Duct Covers
Unscrew the 4 screws that fix the section of the Duct
Cover (Starting collar) and release all parts.
Install the upper section to the support bracket with
2 screws.
Note: Check that joined seam is positioned towards
the back.
Note2: The lower section (Collar) of the duct cover
assembly must be installed at the end of the
installation with 2 screws.
Support
Bracket
Upper
section
Lower
section
(Collar)
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 26 27

Comentarios a estos manuales

Sin comentarios