Zephyr AK1236S Use Guía de instalación Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 21
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
1. Remove filters
2. Remove cover from junction box to
gain access to electrical wiring.
3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.
4. If using hood in air recirculating
mode skip steps 4 and 5.
Pry open desired 3-1/4” x 10” ducting
knock-out either on top or back of
hood.
5. Secure 3-1/4” x 10” starting collar
with damper to the duct opening using
(10) M4x8 screws.
Installation – Preparing Electrical and Ducting
10
www.zephyronline.com
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 20 21

Comentarios a estos manuales

Sin comentarios