Zephyr BVE-E36AS Guía de instalación Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 66
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
1. Remove filters
2. Remove cover from junction box to
gain access to electrical wiring.
3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.
4. If using hood in air recirculating
mode skip steps 4 and 5.
Pry open desired ducting knock-out
either on top or back of hood.
5. Remove starting collar from inside
hood body and secure 3-1/4” x 10”
rect. starting collar to the top or rear
duct opening using (10) M3.5x12
screws.
5. Remove starting collar from inside
hood body and secure 6” round start-
ing collar to the top duct opening using
(10) M3.5x12 screws.
Installation – Preparing Electrical and Ducting
10
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 65 66

Comentarios a estos manuales

Sin comentarios