Zephyr ZPY-E30AW Guía de instalación Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 21
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
Installation – Preparing Duct Location
10
www.zephyronline.com
Note: If using hood in recirculating mode skip these steps and turn to page 11.
Vertical Ducting
(7" Round)
Vertical Ducting
(3-1/4"x10" Rectangular)
1. Using a at-head screwdriver, remove both the
rectangular and round knock-out plates located on
top of hood
1. Using a fl at-head screwdriver, remove only the
rectangular section of the knock-out plate located
on top of hood.
1. Using a fl at-head screwdriver, remove the
rectangular knock-out plate located on back of
hood.
2. Secure 3-1/4" x 10" rectangular collar to top of
hood using (6) M4 x 8 screws.
2. Secure 3-1/4" x 10" rectangular collar to back of
hood using (6) M4 x 8 screws.
2. Secure 7" round collar to top of hood using
(6) M4 x 8 screws.
Horizontal Ducting
(3-1/4"x10" Rectangular)
16
25
34
1
6
2
5
3
4
1
6
2
5
3
4
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 20 21

Comentarios a estos manuales

Sin comentarios