Zephyr AK9800 Guía de instalación Pagina 13

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 21
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 12
INSTALLATION
11
STEP 7
STEP 9 (also refer notes on pg. 16)
STEP 11
STEP 8
STEP 10
STEP 12 (also refer notes pg. 16)
1. Lift hood to bottom of cabinet
1. Support hood to place, fasten both rear with screws
and washers provided.
1. Fasten front of hood. Level all sides and adjust
accordingly.**
1. Drill out cabinet base through electrical box with
3/4" boring bit.
1. Pull electrical supply wire through drill out or use
#14 grounded wire for receptacles (not supplied)
1. Connect both wires (blk) on hood to either power
supply (blk or wht). Ground green wire.**
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Comentarios a estos manuales

Sin comentarios